Skip to content
PartyReport Cards

Party report card · current MPs

Desiya Murpokku Dravida Kazhagam

1 MPs · 0 Lok Sabha · 1 Rajya Sabha · from 1 state

Party score0/100Not ranked (fewer than 3 MPs or no party)

Allocated to its MPs

₹5.30 Cr

1 MPs

Fund utilisation

0%

₹0 recommended
Below national figure (72%)

Paid to vendors

₹0

0% of allocation
Below national figure (38%)

Works completed

0

— of recommended

From recommendation to completion

All works recommended by this party’s MPs

  1. Recommended by its MPs0 works

    ₹0 · 0% of the ₹5.30 Cr allocated

  2. Sanctioned by districts0 works

    — sanctioned

  3. Completed0 works

    ₹0 final cost

In plain words

What the numbers say

  • DMDK’s 1 MPs were allocated ₹5.30 Cr and recommended works worth ₹0 (0%), against 72% for all MPs.
  • ₹0 has been paid to vendors, 0% of the allocation (all MPs: 38%).
  • Its highest-scoring MPs: Shri L. K. Sudhish.
  • 1 of its MPs have at least one published warning flag.

How the party score is made

0/100 on all its MPs’ works and money combined. The black marks show all MPs together (59/100). Median MP score: 0.

  1. Works completed 25%Not enough dataCompleted ÷ recommended works.
  2. Spending efficiency 18%Not enough dataValue of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%0Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 12%Not enough dataShare of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%0Paid to vendors ÷ allocated limit.
  6. Sanction speed 10%Not enough dataAverage days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
  7. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    Not enough data
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Activity over time

Recommendations, payments and completions by month, for this party’s MPs

Value of works MPs recommended each month

No dated records.

Sectors

Share of the value of its works, with the share for all MPs

    States

    Where its MPs come from

    StateMPsUtilisationSpent
    Tamil Nadu10%0%

    Its MPs

    Ranked by MP score. Each name opens the MP’s full report card on the MPLADS Tracker.

    #MPStateAllocatedUtilisationSpentCompletedScore
    1Shri L. K. Sudhish Rajya Sabha · 1 flagTamil Nadu₹5.30 Cr0%0%00

    Warning flags among its MPs

    Published threshold rules: prompts for questions, not findings

    Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)); party from the official Lok Sabha and Rajya Sabha member lists. Party totals add up its current MPs. Methodology · Scheme guide